Construction of a section of the S7 Expressway between Kalsk and Miłomłyn
Total quantity of material supplied: 114k tonnes

Construction was undertaken by Strabag. With the TEFRA 15® binder, the contractor was able to achieve the required load-bearing parameters of the improved ground – 40 MPa. TEFRA 25® hydraulic binder was also used to achieve the compressive strength of Rm 1.5 MPa in non-cohesive soils.

Products used: TEFRA 15® and TEFRA 25®

Construction of a section of the S7 Expressway between Ostróda and Olsztynek
Total quantity of material supplied: 68k tonnes

Construction was undertaken by Strabag and Strabag Infrastruktura. By applying the TEFRA 15® and TEFRA 25® binders, the contractor significantly increased the load-bearing parameters, i.e., above 60 MPa. Also, TEFRA 25® was used as an ingredient of the cement-stabilized soil with the capacity of 2.5MPa and 5 MPa. The use of this binder type was intended to improve the grain structure which translated into increased compressive strength.

Products used: TEFRA 15® and TEFRA 25®

Construction of the S2 Expressway: the Warsaw South Ring Road
Total quantity of material supplied: 54k tonnes

Construction was undertaken by Bilfinger Berger Polska. By applying the TEFRA 15® binder, the contractor significantly reduced the level of moisture in cohesive soils.

Products used: TEFRA 15®

Construction of a section of the S3 Expressway between Nowa Sól and Legnica(A4)
Total quantity of material supplied: 40k tonnes

Construction was undertaken by Budimex. By applying the TEFRA 15® binder, the contractor was able to achieve the required load-bearing parameters of embankment layers.

Products used: TEFRA 15®

Construction of the Toruń-Stryków section of the A1 Highway, section III: between Brzezie and Kowal
Total quantity of material supplied: 30k tonnes

Construction of this expressway was undertaken by an Irish construction company SRB. With the TEFRA 15® binder, the contractor was able to achieve the required load-bearing parameters of the improved ground and embankment layers. TEFRA 25® hydraulic binder was also used to achieve the compressive strength of Rm 1.5 MPa in non-cohesive soils.

Products used: TEFRA 15® and TEFRA 25®

Construction of the A4 Highway, section Tarnów – Rzeszów (Tarnów Płn. – Dębica Wsch. ), (Dębica Wsch. – Rzeszów Zach.)

Total quantity of material supplied: 81,36 tonnes

Construction of the S5 Expressway, section Gniezno – Czachurki

Total quantity of material supplied: 571,78 tonnes

Construction of the S5 Expressway, section Nowe Marzy – Dworzysko

Total quantity of material supplied: tonnes

Construction of the S5 Expressway, section Dworzysko – Aleksandrowo

Total quantity of material supplied: 22 588,28 tonnes

Construction of the S5 Expressway, section Aleksandrowo – Tryszczyn 

Total quantity of material supplied: tonnes

Construction of the S5 Expressway, section Białe Błota – Szubin

Total quantity of material supplied: tonnes

Construction of the S5 Expressway, section Szubin – Jaroszewo

Total quantity of material supplied: tonnes

Construction of the S5 Expressway, section Leszno – Kaczkowo

Total quantity of material supplied: 1 057,60 tonnes

Construction of the S5 Expressway, section Kaczkowo – Kościan

Total quantity of material supplied: tonnes

Construction of the S6 Expressway, section Sianów – Koszalin

Total quantity of material supplied: 1 438,64 tonnes

Construction of the S6 Expressway, section Koszalin – Kołobrzeg

Total quantity of material supplied: tonnes

Construction of the S6 Expressway, section Kołobrzeg Zachód – Ustronie Morskie

Total quantity of material supplied: 55 594,84 tonnes

Construction of the S6 Expressway, section Goleniów – Nowogard 

Total quantity of material supplied: 5 020,32 tonnes

Construction of the S7 Expressway, section Ostróda Beltway 

Total quantity of material supplied: 10 768,48 tonnes

 

Construction of the S8 Expressway, section Salomea – Wolica (urban section)

Total quantity of material supplied: 2 071,56 tonnes

Construction of the S8 Expressway, section Jeżewo – Białystok

Total quantity of material supplied: 3 203,60 tonnes

Construction of the S8 Expressway, section Salomea – Wolica (non-urban section Opacz – Paszków) 

Total quantity of material supplied: tonnes

Construction of the S8 Expressway, section Węzeł Syców Zachodni

Total quantity of material supplied: 27,52 tonnes

Construction of the S8 Expressway, section Sieradz – Złoczew

Total quantity of material supplied: 1 212,36 tonnes

Construction of the S8 Expressway, section Kobyłka – Radzymin

Total quantity of material supplied: tonnes

Construction of the S8 Expressway, section Kobyłka – Marki

Total quantity of material supplied: tonnes

Construction of the S17 Expressway, section Kurów – Lublin – Piaski

Total quantity of material supplied: tonnes

Construction of the S17 Ryki Expressway

Total quantity of material supplied: 1 041,72 tonnes

Construction of the Access Road to Lublin City Beltway – extension of the Mełgiewska Street 

Total quantity of material supplied: tonnes

Construction of the Access Road to the Dąbrowic Junction (section from the crossroads Al.Solidarności with Al. Warszawska to the city limits) in Lublin

Total quantity of material supplied: tonnes

Construction of the Ciechanów City Beltway 

Total quantity of material supplied: 2 000,22 tonnes

Construction of the Mogilno City Beltway 

Total quantity of material supplied: tonnes

Construction of the Mielec City Beltway 

Total quantity of material supplied: tonnes

Construction of the Płock City Beltway 

Total quantity of material supplied: 1 663,42 tonnes

Construction of the Wałcz City Beltway 

Total quantity of material supplied: 4 921,60 tonnes

Construction of the Augustów City Beltway 

Total quantity of material supplied: 10 223,19 tonnes

Construction of the Leżajsk City Beltway 

Total quantity of material supplied: 54,46 tonnes

Construction of the Nowogard City Beltway 

Total quantity of material supplied: tonnes

Construction of the Słupsk City Beltway 

Total quantity of material supplied: 643,74 tonnes

Construction of the Western Beltway of Poznań  

Total quantity of material supplied: 5 241,32 tonnes

Construction of the Zambrów City Beltway 

Total quantity of material supplied: 16 593,71 tonnes

Reconstruction of the DK 65, section Gołdap – Kowale Oleckie

Total quantity of material supplied: 1 182,54 tonnes

Reconstruction of the DW 515, section Lidzbark Warmiński – Orneta

Total quantity of material supplied: 28,16 tonnes

Construction of the S6 Expressway, section Płoty – Kiełpino

Total quantity of material supplied: tonnes

Reconstruction of the DK 11, section Złotkowo – Bogdanowo

Total quantity of material supplied: 109,96 tonnes

Reconstruction of the DW 196, section Murowana Goślina – Wągrowiec

Total quantity of material supplied: 110,16 tonnes

Reconstruction of the DW 768, section Koszyce – Brzesko

Total quantity of material supplied: 450,92 tonnes

Reconstruction of the Nowolazurowa Street in Warsaw 

Total quantity of material supplied: tonnes