Construction of a cut-off wall on a flood embankment at the PUŁTUSK-PRUT site
Total quantity of material supplied: 10k tons

Construction of the cut-off wall was undertaken by Soletanche Polska. With the TEFRA IN® binder, the contractor was able to achieve the required filtration parameters and compressive strength. The work was carried out using the trenchmix technology.

Products used: TEFRA IN®

Reconstruction of a section of the side dam of the Zegrze Reservoir between Łacha and Kania
Total quantity of material supplied: 5k tons

Construction of the cut-off wall was undertaken by Soletanche Polska. With the TEFRA IN® binder, the contractor was able to achieve the required filtration parameters and compressive strength. The work was carried out using the trenchmix technology.

Products used: TEFRA IN®

Expansion of the left and right embankment of the Trześniówka river in the Tarnobrzeg and Grębów districts
Total quantity of material supplied: 15k tons

Construction of the cut-off wall was undertaken by DABI. With the TEFRA IN binder, the contractor was able to achieve the required filtration parameters and compressive strength. The work was carried out using the DSM technology.

Products used: TEFRA IN®

Expansion of the flood embankment of the Vistula River in the valley, Łaziska district, Opole poviat
Total quantity of material supplied: 5k tons

Construction of the cut-off wall was undertaken by BUDOKOP. With the TEFRA IN® binder, the contractor was able to achieve the required filtration parameters and compressive strength. The work was carried out using the trenchmix technology.

Products used: TEFRA IN®

Construction of a cut-off wall on a flood embankment in the Chorula district
Total quantity of material supplied: 5k tons

Construction of the cut-off wall was undertaken by BUDOKOP. With the TEFRA IN® binder, the contractor was able to achieve the required filtration parameters and compressive strength. The work was carried out using the trenchmix technology.

Products used: TEFRA IN®