Construction of a cut-off wall on a flood embankment at the PUŁTUSK-PRUT site
Total quantity of material supplied: 10k tonnes

Construction of the cut-off wall was undertaken by Soletanche Polska. With the TEFRA IN® binder, the contractor was able to achieve the required filtration parameters and compressive strength. The work was carried out using the trenchmix technology.

Products used: TEFRA IN®

Reconstruction of a section of the side dam of the Zegrze Reservoir between Łacha and Kania
Total quantity of material supplied: 5.8k tonnes

With the TEFRA IN® binder, the contractor was able to achieve the required filtration parameters and compressive strength. The work was carried out using the trenchmix technology.

Products used: TEFRA IN®

Expansion of the left and right embankment of the Trześniówka river in the Tarnobrzeg and Grębów districts
Total quantity of material supplied: 15k tonnes

Construction of the cut-off wall was undertaken by DABI. With the TEFRA IN binder, the contractor was able to achieve the required filtration parameters and compressive strength. The work was carried out using the DSM technology.

Products used: TEFRA IN®

Construction of a cut-off wall on a flood embankment in the Chorula district
Total quantity of material supplied: 1.2k tonnes

Construction of the cut-off wall was undertaken by BUDOKOP. With the TEFRA IN® binder, the contractor was able to achieve the required filtration parameters and compressive strength. The work was carried out using the trenchmix technology.

Products used: TEFRA IN®

Expansion of a flood embankment of the Vistula River in the valley, Łaziska borough Opole Lubelskie county
Total quantity of material supplied: 2k tonnes

Construction of the Junikowski Interceptor in Poznań

Reconstruction of the left embankment of Jagiellonian Ditch, polder Fiszewka S, Elbląg brough and Elbląg City
Total quantity of material supplied: 2.7k tonnes

Expansion of the left embankment of the Vistula River: Dorotka – Leśne Chałupy Tarłów borough, Świętokrzyskie voivodeshipy
Total quantity of material supplied: 1k tonnes

Construction of a cut-off wall on a flood embankment in Chorula borough

Modernization of the flood embankment at the Odra River on the section between Dębce and Żabnica 

The valley of the Warta VIII – reconstruction of the left-side flood embankment of the Warta River, reconstruction of the left-side flood embankment of the Struga River from Bartochowo Warta borough, Sieradzki county